Chapter 5. Interconnect Maintenance

Table of Contents

1. Verifying Functionality and Performance
1.1. Availability of Drivers and Services
1.2. Cable Connection Test
1.3. Static Interconnect Test
1.4. Interconnect Load Test
1.4.1. Test Execution from sciadmin GUI
1.4.2. Test Execution from Command Line
1.5. Interconnect Performance Test
2. Replacing Interconnect Cables
3. Replacing an Adapter
4. Physically Moving Nodes
5. Replacing a Node
6. Adding Nodes
7. Removing Nodes

This chapter describes how to perform a number of typical tasks related to the Dolphin Express interconnect.